NI43-101Pre-Feasibility Study Report - page 154

Rare Element Resources
Bear Lodge Project
Canadian NI 43-101 Technical Report
October 9
th
, 2014
10135-200-46 – Rev. 0
10-6
Figure 10.1 - Rare Element 2009 - 2013 REE Drill Holes
(John Ray, Rare Element, 2013)
10.3.1 Drilling Logistics and Methods
Core drilling operations during 2004 (August to December) were performed by AK
Drilling of Butte, Montana, utilizing a truck-mounted Longyear 44 core drilling rig.
Drilling operations in 2005 (October), 2007 (May, June, and October), 2008 (August
and September), 2009 (August to December), 2010 (May to November), 2011 (June
to November), and 2012 (June to December) were conducted by Godbe Drilling LLC
of Montrose, Colorado, and Layne Christensen Company (2009) of Chandler,
Arizona. The 2005 and 2008 drilling programs were conducted with a skid-mounted
Longyear LF-70 core drill, while both truck-mounted Longyear 44 and skid-mounted
Longyear LF-70 drill rigs were used for the 2007 drilling program. Two LF-70 drills
were utilized by Godbe Drilling for the 2009 drill program, while Layne Christensen
utilized a CS1500 truck-mounted core drill. Two LF-70 drills and a CS-1000 were
utilized by Godbe Drilling for the 2010 (June to December) and 2011 (June to
1...,144,145,146,147,148,149,150,151,152,153 155,156,157,158,159,160,161,162,163,164,...587
Powered by FlippingBook