NI43-101Pre-Feasibility Study Report - page 576

Rare Element Resources
Bear Lodge Project
Canadian NI 43-101 PFS Technical Report
October 9
th
, 2014
10035-200-46 - Rev. 0
27-4
Thorium & Uranium-Bearing Mineral Phases Associated with the Bear Lodge REE Deposit,
provided by A. Noble 2014.
Average Thorium and Uranium Abundances of the Bastnasite Group Minerals & Ancylite,
provided by (Clark, 2006 unpublished electron microprobe data8.4 Alkaline Gold)
Chapter 9
Grade-Thickness Block Model, provided by (A. Noble, ORE, 2014)
Bear Lodge Project Exploration Target Areas, 2004 through 2012,
Rare Element’s Bear Lodge Project Exploration, 2004 through 2012
Provided by (John Ray et al 2014)
Chapter 10
Historical Core Drilling for base Metals and REE, provided by (A.Noble et al June 2013)
Rare Element REE Drilling,
Rare Element 2009 - 2013 REE Drill Holes
Provided by (John Ray, Rare Element 2013)
Chapter 11
Rare Element, Dr. Jeffrey Jaacks of Geochemical Applications International Inc. (GAII)
conducted a review of the results for the quality assurance and quality control (QA/QC)
program used in rare earth element assaying for the Bear Lodge exploration drill programs
conducted during 2009 and 2012-2013 at Activation
(All Tables and Figures from Jaacks (2014) QAQC Results for the 2013 Bear Lodge Drilling
Program and Technical Reports)
Standard Statistics Generated from 2009-2013 Drill Standard Analyses
Standard RSD’s Generated from 2009-2013 Drill Standard Analyses
2009-2013 Drill Standard Analyses Results
Standard Analyses for % TREO
2009-2013 Drill Duplicates Results
Crush and Pulp Duplicate Analyses for % TREO
2010-2013 Check Analysis Results
2010-2013 Check Analysis for % TREO
1...,566,567,568,569,570,571,572,573,574,575 577,578,579,580,581,582,583,584,585,586,...587
Powered by FlippingBook