NI43-101Pre-Feasibility Study Report - page 134

Rare Element Resources
Bear Lodge Project
Canadian NI 43-101 Technical Report
October 9
th
, 2014
10135-200-46 – Rev. 0
8-4
meters), down dip extensions to more than 200 feet (60 meters), and thicknesses to
10 feet (3 meters). The oxide zone extends downward to a relatively flat-lying contact
with a narrow oxide-carbonate zone that is conformable with a narrow transition zone
(unlike the irregular oxide/oxide-carbonate upper contact at Bull Hill that extends
locally to the surface).
Figure 8.2 - Plan View of Drill Hole Traces and Mineralized Intercepts
Projected to the Surface
(A. Noble, 2013)
1...,124,125,126,127,128,129,130,131,132,133 135,136,137,138,139,140,141,142,143,144,...587
Powered by FlippingBook