18.2.4.10 Oxalate Thickener
The enclosed Oxalate thickener will be installed in a containment estimated at 180 ft.
x 145 ft. x 4 ft. height (26,100 ft
2
, or 2,427 m
2
), and will be located on the west side of
the main Hydromet building.
18.2.5 Water Supply Facilities
The Hydromet water supply will be provided by a connection to the Upton, WY
municipal water network.
18.2.6 Natural Gas Supply
The Hydromet natural gas supply will be provided by a connection to the Upton
industrial park natural gas network.