Appendix A- February 2014 .pdf | 121 |
1.0 Introduction | 121 |
2.0 Facility Location and Access | 122 |
3.0 Hydromet plant Process Description | 126 |
4.0 Buildings and Structures | 127 |
5.0 Utilities | 129 |
6.0 Tailings Storage Facility | 131 |
7.0 Baseline Environmental Surveys | 133 |
7.1 Air Quality | 133 |
7.2 Groundwater | 133 |
7.3 Surface Water | 136 |
7.4 Background Radiological | 136 |
7.5 Health and Safety | 137 |
7.6 Tailings Characterization | 137 |
7.7 Invasive Non-Native Species | 137 |
7.8 Wetlands | 137 |
7.9 T&E and Special Status Plant Species | 138 |
7.10 Vegetation | 138 |
7.11 Soils | 139 |
7.12 Fish and Wildlife | 139 |
7.13 Animal Species of Concern | 141 |
7.14 Cultural | 141 |
8.0 Reclamation and Closure | 142 |
8.1 Description | 142 |
8.2 Schedule | 142 |
8.3 General Closure Methods | 142 |
8.3.1 Backfill | 142 |
8.3.2 Rough Grade Backfill | 143 |
8.3.3 Fine Grade Backfill | 143 |
8.3.4 Native Topsoil Removal | 143 |
8.3.5 Native Overburden Removal | 143 |
8.3.6 Overburden Redistribution | 143 |
8.3.7 Demolition and Disposal | 143 |
8.3.8 Removal of Monitoring Structures | 143 |
8.3.9 Ripping or Scarification | 143 |
8.3.10 Topsoil Redistribution | 143 |
8.3.11 Soil and Erosion Protection | 144 |
8.3.12 Revegetation | 144 |
8.4 Specific Closure and Reclamation of Affected Areas | 145 |
8.5 Monitoring | 146 |
9.0 References | 148 |
Appendix C - Access Road Design.pdf | 319 |
Compiled Traffic and Accident Data excel sprdsht.pdf | 319 |
Prefeasibility Access Road Design TLL.pdf | 245 |
I INTRODUCTION | 245 |
Objective | 245 |
II DESIGN CRITERIA | 246 |
III INTERSECTION SIGHT DISTANCE AND ACCIDENT HISTORY | 248 |
IV SURVEY AND ROW | 262 |
V SURVEY DATA | 263 |
VI AutoTURN ANALYSIS | 266 |
VII HYDROLOGY | 266 |
VIII HYDRAULICS | 268 |
IX DISTURBANCE AREAS | 270 |
X BLOWING SNOW ANALYSIS | 270 |
XI PREFEASIBILITY COST ESTIMATES | 271 |
XII PROJECT IMPLEMENTATION SCHEDULE | 282 |
Prefeasibility Access Road Design TLL.pdf | 283 |
Appendix D - Hydrology and Hydraulics.pdf | 333 |
11382323 TM PreFeasibilityHydrologyHydraulicsRevE 13FEB14.pdf | 333 |
TECHNICAL MEMORANDUM: BEAR LODGE PROJECT, BULL HILL MINE – PRE-FEASIBILITY HYDROLOGY AND HYDRAULICS, REVISION E | 333 |
Appendix F -Dose Evaluations.pdf | 388 |
Appendix F -1- Public Radiation Dose Evaluation.pdf | 388 |
Section 1 Introduction | 388 |
Section 2 Project Description | 396 |
Section 3 Regulatory Background | 402 |
Section 4 Public Dose Assessment | 407 |
4.1 Atmospheric Dispersion Model | 408 |
4.2 Source Terms | 409 |
4.3 Dose Conversion Factors | 416 |
4.4 Receptors | 418 |
4.5 Public Dose Estimates | 419 |
Section 5 Summary | 423 |
Section 6 References | 424 |
Appendix G Baseline Radiological Report.pdf | 469 |
1.0 Introduction | 469 |
2.0 Baseline Field Investigation Summary and Scope | 472 |
2.1 Overall Scope of Project | 472 |
To assist the reader, it is important to note the following issues that are relevant to the scope of work: | 472 |
2.2 Deviations from the December 2010 SAP and QAPP | 473 |
2.3 Future Work | 473 |
3.0 GPS-BASED GAMMA (DIRECT RADIATION) SURVEY | 475 |
4.0 BASELINE radiological investigation SOIL SAMPLING | 485 |
5.0 Data Quality Assessment for Soil | 498 |
6.0 Radon Flux MeasurementS | 504 |
7.0 AMBIENT RADON MONITORING | 505 |
8.0 Airborne PARTICULATES | 511 |
9.0 AMBIENT GAMMA EXPOSURE RATES | 536 |
10.0 SUMMARY AND CONCLUSIONS | 538 |
11.0 REFERENCES | 540 |
Bear Lodge Exploration PoO - Appendix N - 5-31-2013.pdf | 686 |