NI43-101Pre-Feasibility Study Report - page 191

Rare Element Resources
Bear Lodge Project
Canadian NI 43-101 Technical Report
October 9
th
, 2014
10135-200-46 - Rev. 0
13-7
Table 13.5 - Average Annual Production of Waste Streams
Years 1 to 9
Short tons per
year
Years 1 to 9 Average Total Screening Coarse Reject
41,109
Years 1 to 9 Average Total PUG Reject
0
Years 1 to 9 Average Neutralized Leach Residue
137,692
Years 1 to 9 Average Neutralized Mixed Base Metal
Hydroxides
41,031
Years 1 to 9 Average Calcium Chloride Solids
114,789
Years 1 to 9 Average Thorium-Rich Precipitate
136
Years 10+
Years 10+ Average Total Screening Coarse Reject
70,441
Years 10+ Average Total PUG Reject
79,178
Years 10+ Average Neutralized Leach Residue
155,610
Years 10+ Average Neutralized Mixed Base Metal
Hydroxides
44,887
Years 10+ Average Calcium Chloride Solids
159,595
Years 10+ Average Thorium-Rich Precipitate
192
(Roche, 2014)
13.5 Mineral Processing – Batch Tests
13.5.1 Variability Tests
Granulometry and screen tests were performed on ore from Bull Hill and Whitetail
deposits to assess the benefits of upgrading the ore by simple screening. BH oxide
(Ox) ores are more amenable to upgrade by screening than oxide-carbonatite (OxCa)
ores from the same deposit. Neither the BH Ox nor BH OxCa respond well to
magnetic separation, but they do respond to gravity separation.
Whitetail ore responds well to beneficiation techniques where gravity and magnetic
separators are applied in stages on the coarse ore. 3 inch drill core samples were
obtained from BH and WT deposites. Figure 13.1 and 13.2 are maps indicating
multiple sites (central and outlaying zones) where drill core samples were taken in
1...,181,182,183,184,185,186,187,188,189,190 192,193,194,195,196,197,198,199,200,201,...587
Powered by FlippingBook