Bear Lodge Plan of Operations - page 282

Prefeasibility Access Road Design-Revised
39
Application
Volume
(gal/yd
2
)
Area (yd
2
)
Application
Frequency
1
(per year)
Total
Application
Volume
(gal/year)
0.3
428,736
4
514,483
Warren Peak Route
Road Width
(ft)
Road
Length
(miles)
Road
Length (ft)
Area (ft
2
)
Area
(yd
2
)
24
5.54
29,251
702,024 234,008 Initial Build
24
9.42
49,751
1,194,024 398,008 Initial Build
Application
Volume
(gal/yd2)
Area (yd2)
Application
Frequency
1
(per year)
Total
Application
Volume
(gal/year)
0.3
234,008
4
280,810 Initial Build
0.3
398,008
4
477,610 Final Aggregate Coverage
d.
On asphalt paved roads yearly maintenance consists mainly of a distribution of a
15-year 2” asphalt overlay whereas on gravel roads grading, resurfacing, and
dust control is all considered on a yearly maintenance basis.
The construction of the road will provide year round access to portions of the Bear
Lodge Mountains which have previously been limited to snow vehicle travel during
the winter months. This will enhance the ability of emergency personnel to respond
to any needs which may arise in these areas. Complete maintenance cost estimates
are included in Appendix E.
XII PROJECT IMPLEMENTATION SCHEDULE
Schedules have been created for the Miller Creek and Warren Peak Routes. The
schedules were created with the constraints of the feasibility study starting between
the second quarter of 2012 and the first quarter of 2013. Detailed design would
start in the fourth quarter of 2013 or the first quarter of 2014. The road
1...,272,273,274,275,276,277,278,279,280,281 283,284,285,286,287,288,289,290,291,292,...722