waste, the thickness of the operations layer soil in that traffic path will be increased by an
additional 3 feet of material capable of supporting the vehicular loads.
Contact Surface water runoff from active areas the TSF will drain to collection pond(s)
constructed down gradient of the active area and within the TSF footprint. Sediment control from
the active areas will be controlled as appropriate with silt fences, or other best management
practices, with the collection pond being the final means to manage erosion from the active area
of the TSF.
6.4
CONSTRUCTION
The TSF will be stage-constructed, with embankment construction being completed in advance
of storage requirements.